Calendar An icon of a desk calendar. Cancel An icon of a circle with a diagonal line across. Caret An icon of a block arrow pointing to the right. Email An icon of a paper envelope. Facebook An icon of the Facebook "f" mark. Google An icon of the Google "G" mark. Linked In An icon of the Linked In "in" mark. Logout An icon representing logout. Profile An icon that resembles human head and shoulders. Telephone An icon of a traditional telephone receiver. Tick An icon of a tick mark. Is Public An icon of a human eye and eyelashes. Is Not Public An icon of a human eye and eyelashes with a diagonal line through it. Pause Icon A two-lined pause icon for stopping interactions. Quote Mark A opening quote mark. Quote Mark A closing quote mark. Arrow An icon of an arrow. Folder An icon of a paper folder. Breaking An icon of an exclamation mark on a circular background. Camera An icon of a digital camera. Caret An icon of a caret arrow. Clock An icon of a clock face. Close An icon of the an X shape. Close Icon An icon used to represent where to interact to collapse or dismiss a component Comment An icon of a speech bubble. Comments An icon of a speech bubble, denoting user comments. Comments An icon of a speech bubble, denoting user comments. Ellipsis An icon of 3 horizontal dots. Envelope An icon of a paper envelope. Facebook An icon of a facebook f logo. Camera An icon of a digital camera. Home An icon of a house. Instagram An icon of the Instagram logo. LinkedIn An icon of the LinkedIn logo. Magnifying Glass An icon of a magnifying glass. Search Icon A magnifying glass icon that is used to represent the function of searching. Menu An icon of 3 horizontal lines. Hamburger Menu Icon An icon used to represent a collapsed menu. Next An icon of an arrow pointing to the right. Notice An explanation mark centred inside a circle. Previous An icon of an arrow pointing to the left. Rating An icon of a star. Tag An icon of a tag. Twitter An icon of the Twitter logo. Video Camera An icon of a video camera shape. Speech Bubble Icon A icon displaying a speech bubble WhatsApp An icon of the WhatsApp logo. Information An icon of an information logo. Plus A mathematical 'plus' symbol. Duration An icon indicating Time. Success Tick An icon of a green tick. Success Tick Timeout An icon of a greyed out success tick. Loading Spinner An icon of a loading spinner. Facebook Messenger An icon of the facebook messenger app logo. Facebook An icon of a facebook f logo. Facebook Messenger An icon of the Twitter app logo. LinkedIn An icon of the LinkedIn logo. WhatsApp Messenger An icon of the Whatsapp messenger app logo. Email An icon of an mail envelope. Copy link A decentered black square over a white square.

Scottish Tories unveil plans for major infrastructure projects in Tayside

Rest and be Thankful: The A83 at Beinn Ime.
Rest and be Thankful: The A83 at Beinn Ime.

The Scottish Tories have launched infrastructure plans to improve several key routes across Scotland including the A9, A90 and to take forward the building of the Dundee Northern Relief Road.

The party unveiled their Uniting Scotland plan to rebuild Scotland’s roads, railways and infrastructure in Aberdeen on Monday, including a proposal to reopen the railway line between Perth and Edinburgh.

Scottish Conservative leader Douglas Ross claimed the plans would create “tens of thousands of new jobs and generate long-term economic growth”.

The infrastructure plan also sets out a number of major proposals including the introduction of a Scottish Smart Travel Card, the reversal of the Beeching cuts of the 1960s and the roll-out of full fibre broadband by 2027.

The Tories have vowed to build the new relief road for the A90 Dundee to Aberdeen dual carriageway, which was first identified by Transport Scotland and the Scottish Government more than a decade ago.

The Scottish Government confirmed the plans were being “reappraised” in 2019 but since then, no further work has been carried out on the route.

Improvements to key routes

Proposals have also been unveiled to improve several key routes across Tayside and Perth, including the A90 between Dundee and Aberdeen and the A9 between Perth and Inverness.

Transport Scotland bosses expect to confirm this year if the current timescales for dualling the two major roads “remain deliverable”.

Dualling works between Luncarty and Birnam.

The A9 Perth to Inverness road was due to be completed by 2025 but timescales have been impacted by the Covid-19 pandemic.

On rail, the party revealed it would move to take forward plans to reopen the line between Perth and Edinburgh, to accelerate work to improve rail links between Aberdeen and the central belt and to speed up plans to decarbonise the railways.

The party would also develop a new action plan to meet Scotland’s electric vehicle target, including a complete national charging system by 2025.

‘Bold plans’

Mr Ross said: “We would unite Scotland with closer transport links and improved local services in every part of the country.

Tories infrastructure
Scottish Conservatives leader Douglas Ross.

“If we’re going to tackle the looming economic and jobs crisis, we need to look at bold plans like a three-lane M8, reversing the Beeching cuts and rolling out full fibre broadband everywhere by 2027.

“The SNP’s infrastructure incompetence can be seen all over the country; from the ferries fiasco on the Clyde to the delayed Sick Kids hospital in Edinburgh to the roads in the north-east, they’ve been far too slow to fix.

“Any project by the SNP is inevitably delayed and the costs often spiral out of control.

“By stopping an SNP majority and their push for another referendum, the Scottish Conservatives would get all of the focus back onto rebuilding Scotland.”